Loading...

Dormouse Bridges : South East Water

Home / Dormouse Bridges : South East Water

Dormouse bridge installation at Friston Forest for South East Water

As part of a new 6.4km water main at Friston the route passed through Friston forest, an area known to support dormice.

With construction traffic excavating trenches and using the woodland rides, dormice would be stopped from freely moving through the woodland.

A series of dormice bridges were constructed to create connectivity within the wood by crossing the rides.

These bridges were constructed to be high enough for excavators to pass underneath and provide protection from predators when dormice cross within them.

These will be left in place whilst vegetation regrows and the woodland canopy connectivity re establishes itself.

For more information on any of our projects, please call 01892 722948 or 01892 723226


 Previous  Back to Case Studies Next